A Year of Projects: 2016, Week 1

I have not yet written crafting goals for 2016.  November and December were pretty crazy around here!  First was my mother-in-law’s 80th birthday on Thanksgiving Day.  Then there was the Weavers of Orlando Annual Sale, followed the next weekend by the Holiday Party.  Then we had Christmas festivities with my family.  On December 28, I flew to Indiana to play matron of honor for Stacy’s wedding on January 2.  Chris flew up on December 31 so we got to spend New Year’s Eve together.  We just flew home this afternoon, to a cooler and wetter Florida than I left last Monday.  Stacy’s reception was held in a building at the same fairgrounds that hosts The Fiber Event.  It was so strange to be in that building without seeing rows of lovely fiber, yarn, and tools for sale!

This past week has been busy as the wedding preparations including baking 680 cookies and a 5-tier wedding cake!  Stacy, her mother, her aunt, her sister-in-law, and I baked the cookies last Wednesday.  Fortunately, we had the use of Stacy’s parents’ church kitchen, which had a commercial oven that could fit 150 cookies at once.  We baked all 680 cookies in only 3.5 hours!

Here I am putting the last batch in the oven!
Here I am putting the last batch in the oven!
image

After baking cookies, we started on the cakes.  I was the lead decorator and giver of orders, as I have been decorating cakes since I was 12!  I made the cakes and the lemon curd.  Stacy made the chocolate ganache and all the buttercream and mixed lemon buttercream and raspberry buttercream.

I may have used this cookbook once or twice.
I may have used this cookbook once or twice.

Her mother and aunt cut out fondant Christmas trees and painted them with powdered food coloring.  I showed Stacy’s sister-in-law how to pipe miniature Christmas trees and she cranked out 250 of them, while Stacy’s mother went behind her putting the little stars on top of each tree.

image
The army of trees.

Stacy’s brother cut the dowel rods that help support each tier (using a pipe cutter borrowed from a cousin) and her father cut and sharpened the dowel rod that goes from the top to bottom through all the tiers.  When it came time to stack all the cakes, Chris helped me line up my edges correctly.  At every step of the way, Stacy and I discussed colors and placement of pieces.  This is the first time I’ve made a cake in such a collaborative fashion.  It was so much fun, and I love the result!

image

Now that the wedding is over and I’m home, it’s time to look ahead and lay out my goals for 2016.

Taking Stock

Before I start making ambitious plans for myself, I wanted to look back at 2015, to see what I finished and what remains unfinished.  I’m working on a slide show of all the projects I finished this year, and I will publish that later this week.  Today, I’m making a list of all my WIPs.  It’s a scary list, even though it only includes projects I’ve actually started, not everything in my mental queue!

Knitting WIPs

Projects started in 2015

  • TKGA Master Knitter, Level 1
    • This week I will start working on addressing my gauge issue
  • Splash Socks (started in April 2015)
  • Tier Scarf (started in June 2015)
  • Miranda Shawl (started in July 2015)
  • Bubbles Baby Blanket (started in July 2015)
  • Morrigan Shawl (started in August 2015)
  • Begonia Swirl Shawl Redux (started in August 2015)
  • Finishing
    • I still have all the sweaters I got from S.  They need to be seamed and blocked.  I believe there’s 10 or 11 projects right there!

Projects started prior to 2015

  • Dishcloth Advent Calendar
    • I need to knit or crochet 18 each of 25 different patterns.  This is a list of the knitted dishcloths I’ve finished.
    • 18 leaves
    • 18 tribble scrubbies
    • 18 waffle stitch
    • 4 brick pattern
    • 16 illusion heart
    • 4 random designs (1 each of 4 different patterns)
  • Traveling Scarf
  • Evenstar
  • Baby Blue Monster

Crochet WIPs

  • Granny Square Blanket (started in 2014)
  • Skulls and Roses Scarves (started in October 2015)
  • Dishcloth Advent Calendar
    • I need to knit or crochet 18 each of 25 different patterns.  This is a list of the crochet dishcloths I’ve finished.
    • 18 hyperbolic
    • 9 ladderstitch
    • 4 or 5 diagonal (corner to corner)

Spinning WIPs

  • Camel Down / Silk Blend (started in September 2015)
  • Three Feet of Sheep (started in August 2015)
  • One pound of BFL (started in November 2015)

Weaving WIPs

Since the only loom I’ve been using is my rigid heddle, I only have one weaving project in process!  I started this scarf on December 5, 2015 while at the Weavers of Orlando Annual Sale, so that I could demo weave.  I talked to many people throughout the days of the sale and did a fair bit of weaving.  I haven’t had time to work on it since.

image

In addition to this project, I now have the storage unit full of weaving things to sort.  This includes minor repairs to one loom (the 36″ Harrisville) and probably a complete refinish of a second loom (the 48″ Macomber).  I’m hoping to the the storage unit cleaned out by mid-February, though the refinishing job will most likely take longer than that.

Dyeing

Dyeing doesn’t really have WIPs as something is either dyed or it isn’t.  But this is a list of dyeing projects I’ve been meaning to do but haven’t.

  • Dye Maple Leaf Shawls (pending since December 2014)
  • Dye Triangles (pending since August 2014)
  • water source / pH experiment (pending since early 2015)

I’m not sure if this is actually all my WIPs.  It’s everything I could find laying about or listed in my Ravelry project pages, but I’m sure I missed more.

A Year of Projects: Week 51

I haven’t updated my progress since week 29, back in July!  Since we’re coming to the end of the year, it’s time to review my goals and start thinking about goals for next year.  Anything that’s crossed through in the list is something I did not get to at all.  If I did any work on a goal, even if it isn’t finished, I kept it on the list and made notes about its status.  In early January, I will publish a slide show with pictures of every project I finished this year and a list of goals for next year.  While I didn’t finish everything I hoped to finish this year, I am happy with what I accomplished.  I learned a great deal, especially about crochet, and I’m looking forward to learning more in 2016!

Review of 2015 Goals

Knitting

  • Knit myself a sweater  Moved to 2016.  In July, my friend Stacy got engaged and I’ve been working on projects for her wedding instead of knitting a sweater!
  • Improve my finishing techniques
  • Finish MHK Level 1 
    • First 3 swatches finished by June 24, 2015
    • Swatch #14 finished July 11, 2015
    • Swatches 1-12 knit on size 7 needles, finished by July 19, 2015
    • I did actually finish the swatches by the dates listed here.  I went to Masters’ Day at the TKGA Conference and learned that I had guttering issues I need to work out before finishing my swatches.  I haven’t gotten back to my swatches yet.
  • Dishcloth Advent Calendar
    • Tribbles, finished January 18, 2015
    • Leaves, finished March 30, 2015 but never blogged
    • Waffle Stitch, finished November 18, 2015 but never blogged
    • Heart Illusion Dishcloths (in progress; need to knit two more dishcloths and weave in ends on two finished dishcloths)
    • While I made progress on the Dishcloth Advent Calendar project, it is not complete and will be rolled over into 2016
  • Charity Knits
    • Mock Rib Scarf, finished January 18, 2015
    • Emergency Scarf, finished June 1, 2015
    • A Tisket, A Tasket Scarf, finished September 28, 2015
    • Traveling Scarf, finished September 28, 2015
    • On Location Scarf, finished November 25, 2015
  • Do some test knits
  • Finish or frog all UFOs
    • Traveling Scarf
      • This is different than the Traveling Scarf listed above under Charity Knits.  This one is still in progress!
    • Bigger on the Inside Hat, frogged December 2015
    • Evenstar
    • Quinn Bag, finished July 2015
    • Baby Blue Monster
  • Socks
  • Other Projects
  • Design at least one project from scratch
    • Super Secret Shawl, finished June 1, 2015
    • Traveling Scarf, also listed under Charity Knits above, published free pattern on blog and Ravelry, November 2015

Crochet

  • Learn to read crochet patterns
  • Learn all the basic crochet stitches.
  • Make at least one non-granny square crochet project
    • Five crocheted skulls & roses scarves, three finished by October 31, 2015; two still pending assembly
    • Hyperbolic Dishcloths, finished October 3, 2015
  • Dishcloth Advent Calendar
    • Diagonal Crochet Dishcloths (in progress)
    • Hyperbolic Crochet, finished October 3, 2015

Spinning

  • Breed Specific Spinning
    • Cormo, finished September 2015
    • BFL (in progress)
  • Learn to spin on a drop spindle, goal moved to 2016

Weaving

  • Continue playing with color and weave drafts
    • Ravenclaw Houndstooth Scarf, finished January 19, 2015
    • Solid Warp, alternating picks, one of which matches warp, finished December 4, 2015
  • Learn pick up stick drafts
  • Learn Inkle Weaving
    • Completed first inkle band as part of the “All the Crafts” Hat, September 30, 2015
  • Learn Kumihimo braiding
  • Explore Twill weaves on the floor loom
  • Make items for the Guild Sale
  • Other

Dyeing

  • Finish dyeing the MAPLE LEAF Shawls
  • pH / water source experiment
  • Return to dye triangles project

A Year of Projects 2015, Week 26.5

come-blog_0

For the past week, I’ve been crafting like it’s my job.  I also had an unusually high number of fun activities.  I had lunch in Diagon Alley with Ravelry friends who were in Orlando on vacation from Massachusetts.

image
Of all the items listed for sale here, I most want the never-tangle wool.

I went to my first ever professional soccer game.  It was my cousin’s wife’s birthday and that’s what she wanted to do.

image

My husband and I bought tickets to view last Sunday’s SpaceX Falcon 9 launch from the NASA causeway.  We didn’t want to get up at the crack of dawn and drive over, so we drove over Saturday night and stayed in a hotel.

image
If you look closely, you can see Launch Pad 40 and maybe the rocket on the pad. There’s 4 objects that look like buildings. Pad 40 is between the two right hand buildings. There’s 4 lightning towers surrounding the pad; the rocket is in the middle.  It’s a slightly thicker line than the 4 surrounding towers.

Here’s the video I took of the launch.  The vehicle failed 139 seconds after launch.  I stopped recording two seconds before that because I was using my phone to record video and could barely see anything at that point.  It looked like a beautiful, perfect launch with nothing more to see.  And then the Liquid Oxygen tank exploded.

I still managed to get quite a bit of crafting done!  Let’s review the ridiculously ambitious list of goals I wrote:

Goals for June 21 to 30, 2015

  • Finish Raindrops on Roses Shawl (Headmistress Challenge)
  • Finish Grisou Scarf (homework, but which class?)
  • Finish Solid / 1×1 Scarf (OWL)
  • Three more color and weave scarves to meet OWL 50% (highly unlikely to finish)
  • Finish current Heart Illusion Dishcloth, plus 4 more (COMC?)
  • Tier Scarf (Charms or Potions)
  • Crochet Dishcloths (Transfiguration)
  • MHK1 swatches (Divination and / or Charms)
  • Small stuffed bird (DADA)
  • Cast on Sweet Summer Shawl (Quidditch Round 3; due July 8)
  • Liquid Silver Swatch (OOTP; due July 19)
  • Cast on Begonia Swirl Shawl (Headmistress Challenge; due July 28)

Fully Accomplished Goals

I finished the Raindrops on Roses Shawl.  I absolutely love it.  I test knit this for Assorted Musings (Ravelry, blog); the pattern will be released on July 15.  I plan to publish a detailed blog post for FO Friday on July 3.

image

I finished the Grisou Scarf.  I test knit this for Sasoolero (Ravelry, blog) and I’m not sure when she plans to release the pattern.  I will publish a blog post on this project for FO Friday on July 3.

IMG_9439

Partially Accomplished Goals

I started the Solid / 1×1 Scarf.  I’ve woven somewhere between 1/3 and 1/2 of it.  I have the hardest time taking pictures of weaving in progress.  Since the finished work gets wound onto the cloth beam, it’s difficult to see progress!

image

I finished the Heart Illusion Dishcloth that I had in progress, plus two more.

image

I started the tier scarf and knit about 1/3 of it.

Knitting while waiting for the rocket launch.
Knitting while waiting for the rocket launch.

I crocheted one dishcloth.  In my goal, I didn’t say how many I wanted to knit.  I need 18 for the Dishcloth Advent Calendar, but didn’t expect to get them all done this month.  I was hoping for 9.  I learned how to single crochet increase, single crochet decrease, and crochet through the back loop.

I knit the first 3 swatches for MHK1.  I still need to weave in the ends and block them.  I also wrote answers to several more questions.

image

Unaccomplished Goals

As expected, I did not weave the 3 additional scarves for my OWL.  I did not make the stuffed bird.  I decided to submit the Grisou scarf for DADA instead, and didn’t need the bird for anything else.  I have not cast on the Sweet Summer Shawl.  I will be doing that today.  I have not swatched for Liquid Silver.  I will be doing that today.  I have not cast on Begonia Swirl Shawl.  I think I’m going to wait a couple of weeks and cast on before I go to TKGA in San Diego.  It will make excellent travel knitting.

Other Projects

I made a felted cat bed for Tiger.  I managed to knit 1,047 yards worth of garter stitch in less than 3 days, felt it, and stitch it together!  It wasn’t on my goal list because I hadn’t decided to do it until after I wrote that list.  Tiger’s been sleeping on an alpaca blanket my father bought me when he was in Peru and I didn’t want it ruined.  I needed a quick replacement.

image

Goals for July 1 to 5, 2015

  • Knit at least 1/2 of the Sweet Summer Shawl
  • Cast on Miranda Shawl
  • Swatch and Cast on Bubbles Baby Blanket
  • Swatch and Cast on Liquid Silver Shawl
  • Finish spinning and plying the Cormo I’ve been working on since February
  • Start spinning the 3 Feet of Sheep (8 ounces BFL) on July 4 for Tour de Fleece

I’m tempted to write more, but I think this is more than enough.  My husband is off on Friday and Monday for the July 4 holiday.  I will have less crafting time than usual because I’ll be hanging out with him, and we’re going to the beach for at least one day!

Updated List of Goals for 2015

Knitting

  • Knit myself a sweater
  • Improve my finishing techniques
  • Finish MHK Level 1
    • First 3 swatches finished by June 24, 2015
  • Dishcloth Advent Calendar
    • Tribbles, finished January 18, 2015
    • Leaves, finished March 30, 2015 but never blogged
    • Heart Illusion Dishcloths (in progress)
  • Charity Knits
  • Do some test knits
    • Sand Tracks Scarf, finished June 16, 2015
    • Grisou Scarf, finished June 24, 2015
    • Raindrops on Roses Shawlette, finished June 27, 2015
  • Finish or frog all UFOs
    • Traveling Scarf
    • Bigger on the Inside Hat
    • Evenstar
    • Quinn Bag
    • Baby Blue Monster
  • Socks
  • Other Projects
  • Design at least one project from scratch

Crochet

  • Learn to read crochet patterns
  • Learn all the basic crochet stitches.
  • Make at least one non-granny square crochet project
  • Dishcloth Advent Calendar
    • Diagonal Crochet Dishcloths (in progress)

Spinning

  • Breed Specific Spinning
  • Learn to spin on a drop spindle

Weaving

  • Continue playing with color and weave drafts
  • Learn pick up stick drafts
  • Learn Inkle Weaving
  • Learn Kumihimo braiding
  • Explore Twill weaves on the floor loom
  • Make items for the Guild Sale
  • Other

Dyeing

  • Finish dyeing the MAPLE LEAF Shawls
  • pH / water source experiment
  • Return to dye triangles project

A Year of Projects 2015, Week 25

It’s been a busy week around here, and this coming week will be busy too.  However, there’s always time to craft!

come-blog_0

Here’s the list of goals I wrote last week:

Goals for the Week of June 14 – 20, 2015

  • Finish the Sand Tracks Scarf.
  • Finish the Raindrops on Roses Shawlette.
  • Finish half of the questions and swatches for MHK1.
  • Finish at least one color and weave scarf on the rigid heddle loom.
  • Cast on the Liquid Silver Shawl.
  • Knit the Grisou Scarf (another test knit).

I’ve finished the Sand Tracks Scarf.

image

The Raindrops on Roses Shawlette is a stockinette stitch body with three repeats of a lace pattern.  I finished that, but did not bind off.  I have enough yarn to knit at least one, possibly two, more repeats of the lace.  Since this is a test knit, I e-mailed the designer and asked if she preferred that I bind off now, per the pattern, or if it was okay for me to knit extra repeats.  She said she’d like to see the shawl in a larger size, so I’m going to knit the additional repeats and expect to finish early this week.  Here’s how it looked on Wednesday, 4 rows shy of finishing the first three lace repeats:

image

I haven’t done anything with MHK1 this week.  I need to make this a priority as I want to finish before I go to TKGA’s Annual Conference in San Diego from July 21-26.

Yesterday, I tied on a color and weave scarf.  This is a solid red warp.  The weft alternates one pick of the same red as the warp with one pick of a tweed.  I’ve woven perhaps 1/4 of the scarf, and plan to finish it early this week.

image

I looked at all the crafting I plan to finish this month and decided to move Liquid Silver to early July.  I do want to swatch for it by the end of the month.

The Grisou Scarf is a test knit.  I am using a different yarn than the designer, so swatched for it.  I ended up knitting swatches with three different size needles!  I’ve just got to finish the border, and expect to finish knitting it today.

image

While I was waiting to hear back from the designer of Raindrops on Roses and for the Grisou swatches to dry, I cast on another Heart Illusion Dishcloth.  I got about 1/2 of it knit.

image

Finally, though this has nothing to do with knitting, I wanted to post a picture of me with my father, since today is Father’s Day in the United States.  I often say that I’ve birdwatched since I was 6 months old.  My father started birdwatching shortly after my parents married, and once I came along, I was in a backpack on his back.  This morning, my father, mother, aunt, uncle, and I went birdwatching for Father’s Day.  We went to a newly opened 11 mile drive that skirts along the northern edge of Lake Apopka, not far from where we live.  We only saw 22 species of birds, all of which are common in our area, but we saw many, many individual birds of most species.  Here’s a picture my mom took of my Dad and I, looking at birds:

image

Goals for June 21 to 30, 2015

I’m writing this set of goals through the end of the month, to cover the class deadlines for the HPKCHC.  I honestly don’t expect to finish all of these items, but I’m going to do my best!

  • Finish Raindrops on Roses Shawl (Headmistress Challenge)
  • Finish Grisou Scarf (homework, but which class?)
  • Finish Solid / 1×1 Scarf (OWL)
  • Three more color and weave scarves to meet OWL 50% (highly unlikely to finish)
  • Finish current Heart Illusion Dishcloth, plus 4 more (COMC?)
  • Tier Scarf (Charms or Potions)
  • Crochet Dishcloths (Transfiguration)
  • MHK1 swatches (Divination and / or Charms)
  • Small stuffed bird (DADA)
  • Cast on Sweet Summer Shawl (Quidditch Round 3; due July 8)
  • Liquid Silver Swatch (OOTP; due July 19)
  • Cast on Begonia Swirl Shawl (Headmistress Challenge; due July 28)

Updated List of Goals for 2015

Knitting

  • Knit myself a sweater
  • Improve my finishing techniques
  • Finish MHK Level 1
  • Dishcloth Advent Calendar
    • Tribbles, finished January 18, 2015
    • Leaves, finished March 30, 2015 but never blogged
    • Heart Illusion Dishcloths (in progress)
  • Charity Knits
  • Do some test knits
    • Sand Tracks Scarf, finished June 16, 2015
    • Raindrops on Roses Shawlette (in progress)
  • Finish or frog all UFOs
    • Traveling Scarf
    • Bigger on the Inside Hat
    • Evenstar
    • Quinn Bag
    • Baby Blue Monster
  • Socks
  • Other Projects
  • Design at least one project from scratch

Crochet

  • Learn to read crochet patterns
  • Learn all the basic crochet stitches.
  • Make at least one non-granny square crochet project
  • Dishcloth Advent Calendar

Spinning

  • Breed Specific Spinning
  • Learn to spin on a drop spindle

Weaving

  • Continue playing with color and weave drafts
  • Learn pick up stick drafts
  • Learn Inkle Weaving
  • Learn Kumihimo braiding
  • Explore Twill weaves on the floor loom
  • Make items for the Guild Sale
  • Other

Dyeing

  • Finish dyeing the MAPLE LEAF Shawls
  • pH / water source experiment
  • Return to dye triangles project

A Year of Projects: Introduction and Week 24

come-blog_0

I just stumbled across the Year of Projects group on Ravelry.  This is a blog-along group.  Participants make a list of crafting goals for the year and post weekly updates on their progress.  The Year of Projects runs from July 1 through June 30, so we are almost at the end of the year.  Some participants run on an annual schedule, however.  I decided that I will participate on an annual schedule.  I already made a list for 2015, but I haven’t been reviewing it or updating it.  Now you’ll get an update post every Sunday.  Since I already post a WIP Wednesday post, I think the Sunday post will probably just be a list with completed items crossed off, but that may change!

Previous Posts

Since it’s been awhile since I’ve written about my goals — and I haven’t really reviewed them myself since I wrote them — I thought I’d link to the posts I wrote back in January.

2015 Goals and Plans

UFO Inventory

Breed Specific Fiber Inventory & Breed Specific Fiber Inventory, Updated

Apparently, I never wrote a post about my Stashdown plans.  I thought I had!

Current Status

Stashdown

I set the goal of knitting from stash.  I would not buy new yarn, except for weaving yarn.  Uh, yeah.  turns pink  That hasn’t happened.  There’s been much acquisition of stash, and not all of it is for weaving.

UFOs

Here’s the list again.  If I’ve finished or frogged the project, it’s linked to the relevant blog post.  If it’s not linked, I haven’t finished it.

After I made this list, I found another project.  I need to stuff and assemble a Baby Blue Monster.

2015 Goals and Plans

Knitting

  • Knit myself a sweater
  • Improve my finishing techniques

I haven’t done a sweater yet, but I never intended to make one until the fall, so that’s okay.  In July, I’m attending The Knitting Guild Association meeting in San Diego, and I’m taking a two-day Finishing class with Arenda Holladay!

Crocheting

  • Learn to read crochet patterns
  • Learn all the basic crochet stitches.
  • Make at least one non-granny square crochet project

Yeah, I’ve done none of this.

Spinning

The Cotton Candy Corriedale was a breed-specific fiber, but I haven’t been thinking of it as part of that project and I did not write a separate blog post about it. The Cormo that I’m currently spinning is the first fiber that I’m counting as part of the breed specific spinning project.  The updated Breed Specific Inventory is no longer correct.  I never received the fiber from Little Barn.  I ended up filing a complaint with PayPal to get my money back.  I’ve also bought some fiber from other sources since.  I’m no longer sure that I want to process the Mystery Fleece.  I’ve brought it to demos and it’s nice to have an unprocessed fleece for that purpose.

Weaving

  • Continue playing with color and weave drafts
  • Learn pick up stick drafts

I finished the Ravenclaw and Slytherin Houndstooth Scarves this year, which goes to the color and weave goal.  My OWL proposal for the current term of HPKCHC was to weave 8 scarves using 8 different color and weave patterns.  I haven’t started that yet, but plan to start this week.  If I complete the 8 scarves, that will pretty much fulfill the color and weave goal.  I have not started on pick up stick drafts.

Dyeing

  • Finish dyeing the MAPLE LEAF Shawls
  • pH / water source experiment

None of this has happened.

Projects

I only had a few project goals for this year.

Other Finished Projects

This is a list of all the projects I’ve finished so far this year.  I’m omitting anything already listed above.  These projects don’t necessarily fit into any of the goals I wrote in January.  I was surprised that there’s so few!  I guess I’ve been more on target than I realized 🙂

IMG_8960
IMG_8959

Updated List of Goals

I’m collating the above list into one so that I can more easily post on Sundays.  I’m also adding some goals.  I’ve taken on additional projects and I’ve acquired a floor loom!  I’m not including a stash-related goal.  I don’t plan to acquire more yarn this year, but who do I think I’m kidding?

Knitting

  • Knit myself a sweater
  • Improve my finishing techniques
  • Finish MHK Level 1
  • Dishcloth Advent Calendar
    • Tribbles
    • Leaves
  • Charity Knits
  • Do some test knits
    • Sand Tracks Scarf (in progress)
    • Raindrops on Roses Shawlette (in progress)
  • Finish or frog all UFOs
    • Traveling Scarf
    • Bigger on the Inside Hat
    • Evenstar
    • Quinn Bag
    • Baby Blue Monster
  • Socks
  • Other Projects
    • Liquid Silver (remaking from scratch, since I frogged it!)
    • Fountain Pen Shawl
  • Design at least one project from scratch

Crochet

  • Learn to read crochet patterns
  • Learn all the basic crochet stitches.
  • Make at least one non-granny square crochet project
  • Dishcloth Advent Calendar

Spinning

  • Breed Specific Spinning
  • Learn to spin on a drop spindle

Weaving

  • Continue playing with color and weave drafts
  • Learn pick up stick drafts
  • Learn Inkle Weaving
  • Learn Kumihimo braiding
  • Explore Twill weaves on the floor loom
  • Make items for the Guild Sale
    • Slytherin Houndstooth Scarf

Dyeing

  • Finish dyeing the MAPLE LEAF Shawls
  • pH / water source experiment
  • Return to dye triangles project

Goals for the Week of June 14 – 20, 2015

  • Finish the Sand Tracks Scarf.
  • Finish the Raindrops on Roses Shawlette.
  • Finish half of the questions and swatches for MHK1.
  • Finish at least one color and weave scarf on the rigid heddle loom.
  • Cast on the Liquid Silver Shawl.
  • Knit the Grisou Scarf (another test knit).
Review Your Cart
0
Add Coupon Code
Subtotal