A Year of Projects 2015, Weeks 27 & 28

come-blog_0

I didn’t write a Year of Projects post last Sunday, so this post covers the last week and a half of progress.  Saturday, July 4 was Independence Day in the United States.  My husband had Friday and Monday off, and we planned to go to the beach at least one day.  We didn’t go because I wasn’t feeling well on Sunday and Monday.  On Friday, my family got together for lunch:

image

Chris and I hung out around the house for the rest of the long weekend.  The rest of this week was our usual routine.  Today we did some yard work.  The aloe plants in our backyard are blooming.  I love their flowers!

image

I’m also happy to report that while Tiger seemed suspicious of his cat bed when I first made it, he’s decided he quite likes it.  It is now his favorite place to sleep — if no human lap is available, that is!

image

Let’s review the goals I set when last I wrote a Year of Projects post:

Goals for July 1 to 5, 2015

  • Knit at least 1/2 of the Sweet Summer Shawl
  • Cast on Miranda Shawl
  • Swatch and Cast on Bubbles Baby Blanket
  • Swatch and Cast on Liquid Silver Shawl
  • Finish spinning and plying the Cormo I’ve been working on since February
  • Start spinning the 3 Feet of Sheep (8 ounces BFL) on July 4 for Tour de Fleece

I finished the Sweet Summer Shawl on July 8.

image

I cast on the Miranda Shawl, knit 8 rows, discovered that my mistake on the cast on row was going to be a problem, ripped it all the way out, and cast on again.  I only cast on again yesterday and I’m now making excellent progress.

image

Since I’m working on the Cormo as part of Tour de Fleece, I’ve been writing regular updates about it (Stage 1, Stage 3, Stage 6, Stage 7).  Today I finally finished plying it!  The bobbin on top is the one I finished plying for Stage 7.  I finished the other two bobbins today.

image

I have not started the baby blanket, Liquid Silver Shawl, or spun any of the BFL.  I didn’t include anything about the Master Hand Knitting swatches on my goal list, but it is an ever-present goal.  I knit one more swatch in the last week:

image

Goals for July 13 to 19, 2015

The next two weeks I will be very busy.  My cousin is in town next weekend.  I’m also taking a three-day weaving workshop from the 17th through the 19th.  On the 21st, I head to San Diego for The Knitting Guild Association Annual Conference, and I won’t be home until the 26th.  I have a long list of things to do and little hope that everything will get done!  I’m trying to write a modest list of goals, and it’s taking every bit of restraint I have to keep it short.

  • Finish the Miranda Shawl
  • Knit all the homework swatches for TKGA classes
  • Finish knitting the MHK1 swatches
  • Spin 1 color of the BFL / day (there’s 10 colors / 8 ounces total in Three Feet of Sheep)

On Deck:

  • Mittens for MHK1
  • Liquid Silver Shawl
  • Bubble Baby Blanket
  • Weaving with VCR tape
  • Color and Weave Study scarves
  • Begonia Swirl Shawl

Updated List of Goals for 2015

Knitting

  • Knit myself a sweater
  • Improve my finishing techniques
  • Finish MHK Level 1
    • First 3 swatches finished by June 24, 2015
    • Swatch #14 finished July 11, 2015
  • Dishcloth Advent Calendar
    • Tribbles, finished January 18, 2015
    • Leaves, finished March 30, 2015 but never blogged
    • Heart Illusion Dishcloths (in progress)
  • Charity Knits
  • Do some test knits
    • Sand Tracks Scarf, finished June 16, 2015
    • Grisou Scarf, finished June 24, 2015
    • Raindrops on Roses Shawlette, finished June 27, 2015
    • Miranda Shawl (in progress)
  • Finish or frog all UFOs
    • Traveling Scarf
    • Bigger on the Inside Hat
    • Evenstar
    • Quinn Bag
    • Baby Blue Monster
  • Socks
  • Other Projects
  • Design at least one project from scratch

Crochet

  • Learn to read crochet patterns
  • Learn all the basic crochet stitches.
  • Make at least one non-granny square crochet project
  • Dishcloth Advent Calendar
    • Diagonal Crochet Dishcloths (in progress)

Spinning

  • Breed Specific Spinning
    • Cormo (in progress)
  • Learn to spin on a drop spindle

Weaving

  • Continue playing with color and weave drafts
  • Learn pick up stick drafts
  • Learn Inkle Weaving
  • Learn Kumihimo braiding
  • Explore Twill weaves on the floor loom
  • Make items for the Guild Sale
  • Other

Dyeing

  • Finish dyeing the MAPLE LEAF Shawls
  • pH / water source experiment
  • Return to dye triangles project

WIP Wednesday: July 8, 2015

I wasn’t sure if I would have anything for WIP Wednesday this week.  I’ve been knitting a shawl, which I finished and blocked today.  I do have an update on my Tour de Fleece spinning and I cast on a new project!

Tour de Fleece, Day 5

I really, really, really wanted to finish the cormo today.  I didn’t quite make it.  I have 0.09 ounces left to spin.  That’s not a lot, but at the rate I’m spinning it’ll take at least 1/2 hour and it’s already 1 am.  I’m throwing in the towel.  I’ll finish it tomorrow.

image

Miranda Shawl

I cast on and knit the first 4 rows of a new shawl.  This one is another test knit.  Since it’s knit from the bottom up, I had to cast on 418 stitches!

image
Review Your Cart
0
Add Coupon Code
Subtotal