A Year of Projects: 2016, Week 1

I have not yet written crafting goals for 2016.  November and December were pretty crazy around here!  First was my mother-in-law’s 80th birthday on Thanksgiving Day.  Then there was the Weavers of Orlando Annual Sale, followed the next weekend by the Holiday Party.  Then we had Christmas festivities with my family.  On December 28, I flew to Indiana to play matron of honor for Stacy’s wedding on January 2.  Chris flew up on December 31 so we got to spend New Year’s Eve together.  We just flew home this afternoon, to a cooler and wetter Florida than I left last Monday.  Stacy’s reception was held in a building at the same fairgrounds that hosts The Fiber Event.  It was so strange to be in that building without seeing rows of lovely fiber, yarn, and tools for sale!

This past week has been busy as the wedding preparations including baking 680 cookies and a 5-tier wedding cake!  Stacy, her mother, her aunt, her sister-in-law, and I baked the cookies last Wednesday.  Fortunately, we had the use of Stacy’s parents’ church kitchen, which had a commercial oven that could fit 150 cookies at once.  We baked all 680 cookies in only 3.5 hours!

Here I am putting the last batch in the oven!
Here I am putting the last batch in the oven!
image

After baking cookies, we started on the cakes.  I was the lead decorator and giver of orders, as I have been decorating cakes since I was 12!  I made the cakes and the lemon curd.  Stacy made the chocolate ganache and all the buttercream and mixed lemon buttercream and raspberry buttercream.

I may have used this cookbook once or twice.
I may have used this cookbook once or twice.

Her mother and aunt cut out fondant Christmas trees and painted them with powdered food coloring.  I showed Stacy’s sister-in-law how to pipe miniature Christmas trees and she cranked out 250 of them, while Stacy’s mother went behind her putting the little stars on top of each tree.

image
The army of trees.

Stacy’s brother cut the dowel rods that help support each tier (using a pipe cutter borrowed from a cousin) and her father cut and sharpened the dowel rod that goes from the top to bottom through all the tiers.  When it came time to stack all the cakes, Chris helped me line up my edges correctly.  At every step of the way, Stacy and I discussed colors and placement of pieces.  This is the first time I’ve made a cake in such a collaborative fashion.  It was so much fun, and I love the result!

image

Now that the wedding is over and I’m home, it’s time to look ahead and lay out my goals for 2016.

Taking Stock

Before I start making ambitious plans for myself, I wanted to look back at 2015, to see what I finished and what remains unfinished.  I’m working on a slide show of all the projects I finished this year, and I will publish that later this week.  Today, I’m making a list of all my WIPs.  It’s a scary list, even though it only includes projects I’ve actually started, not everything in my mental queue!

Knitting WIPs

Projects started in 2015

  • TKGA Master Knitter, Level 1
    • This week I will start working on addressing my gauge issue
  • Splash Socks (started in April 2015)
  • Tier Scarf (started in June 2015)
  • Miranda Shawl (started in July 2015)
  • Bubbles Baby Blanket (started in July 2015)
  • Morrigan Shawl (started in August 2015)
  • Begonia Swirl Shawl Redux (started in August 2015)
  • Finishing
    • I still have all the sweaters I got from S.  They need to be seamed and blocked.  I believe there’s 10 or 11 projects right there!

Projects started prior to 2015

  • Dishcloth Advent Calendar
    • I need to knit or crochet 18 each of 25 different patterns.  This is a list of the knitted dishcloths I’ve finished.
    • 18 leaves
    • 18 tribble scrubbies
    • 18 waffle stitch
    • 4 brick pattern
    • 16 illusion heart
    • 4 random designs (1 each of 4 different patterns)
  • Traveling Scarf
  • Evenstar
  • Baby Blue Monster

Crochet WIPs

  • Granny Square Blanket (started in 2014)
  • Skulls and Roses Scarves (started in October 2015)
  • Dishcloth Advent Calendar
    • I need to knit or crochet 18 each of 25 different patterns.  This is a list of the crochet dishcloths I’ve finished.
    • 18 hyperbolic
    • 9 ladderstitch
    • 4 or 5 diagonal (corner to corner)

Spinning WIPs

  • Camel Down / Silk Blend (started in September 2015)
  • Three Feet of Sheep (started in August 2015)
  • One pound of BFL (started in November 2015)

Weaving WIPs

Since the only loom I’ve been using is my rigid heddle, I only have one weaving project in process!  I started this scarf on December 5, 2015 while at the Weavers of Orlando Annual Sale, so that I could demo weave.  I talked to many people throughout the days of the sale and did a fair bit of weaving.  I haven’t had time to work on it since.

image

In addition to this project, I now have the storage unit full of weaving things to sort.  This includes minor repairs to one loom (the 36″ Harrisville) and probably a complete refinish of a second loom (the 48″ Macomber).  I’m hoping to the the storage unit cleaned out by mid-February, though the refinishing job will most likely take longer than that.

Dyeing

Dyeing doesn’t really have WIPs as something is either dyed or it isn’t.  But this is a list of dyeing projects I’ve been meaning to do but haven’t.

  • Dye Maple Leaf Shawls (pending since December 2014)
  • Dye Triangles (pending since August 2014)
  • water source / pH experiment (pending since early 2015)

I’m not sure if this is actually all my WIPs.  It’s everything I could find laying about or listed in my Ravelry project pages, but I’m sure I missed more.

A Year of Projects 2015, Week 26.5

come-blog_0

For the past week, I’ve been crafting like it’s my job.  I also had an unusually high number of fun activities.  I had lunch in Diagon Alley with Ravelry friends who were in Orlando on vacation from Massachusetts.

image
Of all the items listed for sale here, I most want the never-tangle wool.

I went to my first ever professional soccer game.  It was my cousin’s wife’s birthday and that’s what she wanted to do.

image

My husband and I bought tickets to view last Sunday’s SpaceX Falcon 9 launch from the NASA causeway.  We didn’t want to get up at the crack of dawn and drive over, so we drove over Saturday night and stayed in a hotel.

image
If you look closely, you can see Launch Pad 40 and maybe the rocket on the pad. There’s 4 objects that look like buildings. Pad 40 is between the two right hand buildings. There’s 4 lightning towers surrounding the pad; the rocket is in the middle.  It’s a slightly thicker line than the 4 surrounding towers.

Here’s the video I took of the launch.  The vehicle failed 139 seconds after launch.  I stopped recording two seconds before that because I was using my phone to record video and could barely see anything at that point.  It looked like a beautiful, perfect launch with nothing more to see.  And then the Liquid Oxygen tank exploded.

I still managed to get quite a bit of crafting done!  Let’s review the ridiculously ambitious list of goals I wrote:

Goals for June 21 to 30, 2015

  • Finish Raindrops on Roses Shawl (Headmistress Challenge)
  • Finish Grisou Scarf (homework, but which class?)
  • Finish Solid / 1×1 Scarf (OWL)
  • Three more color and weave scarves to meet OWL 50% (highly unlikely to finish)
  • Finish current Heart Illusion Dishcloth, plus 4 more (COMC?)
  • Tier Scarf (Charms or Potions)
  • Crochet Dishcloths (Transfiguration)
  • MHK1 swatches (Divination and / or Charms)
  • Small stuffed bird (DADA)
  • Cast on Sweet Summer Shawl (Quidditch Round 3; due July 8)
  • Liquid Silver Swatch (OOTP; due July 19)
  • Cast on Begonia Swirl Shawl (Headmistress Challenge; due July 28)

Fully Accomplished Goals

I finished the Raindrops on Roses Shawl.  I absolutely love it.  I test knit this for Assorted Musings (Ravelry, blog); the pattern will be released on July 15.  I plan to publish a detailed blog post for FO Friday on July 3.

image

I finished the Grisou Scarf.  I test knit this for Sasoolero (Ravelry, blog) and I’m not sure when she plans to release the pattern.  I will publish a blog post on this project for FO Friday on July 3.

IMG_9439

Partially Accomplished Goals

I started the Solid / 1×1 Scarf.  I’ve woven somewhere between 1/3 and 1/2 of it.  I have the hardest time taking pictures of weaving in progress.  Since the finished work gets wound onto the cloth beam, it’s difficult to see progress!

image

I finished the Heart Illusion Dishcloth that I had in progress, plus two more.

image

I started the tier scarf and knit about 1/3 of it.

Knitting while waiting for the rocket launch.
Knitting while waiting for the rocket launch.

I crocheted one dishcloth.  In my goal, I didn’t say how many I wanted to knit.  I need 18 for the Dishcloth Advent Calendar, but didn’t expect to get them all done this month.  I was hoping for 9.  I learned how to single crochet increase, single crochet decrease, and crochet through the back loop.

I knit the first 3 swatches for MHK1.  I still need to weave in the ends and block them.  I also wrote answers to several more questions.

image

Unaccomplished Goals

As expected, I did not weave the 3 additional scarves for my OWL.  I did not make the stuffed bird.  I decided to submit the Grisou scarf for DADA instead, and didn’t need the bird for anything else.  I have not cast on the Sweet Summer Shawl.  I will be doing that today.  I have not swatched for Liquid Silver.  I will be doing that today.  I have not cast on Begonia Swirl Shawl.  I think I’m going to wait a couple of weeks and cast on before I go to TKGA in San Diego.  It will make excellent travel knitting.

Other Projects

I made a felted cat bed for Tiger.  I managed to knit 1,047 yards worth of garter stitch in less than 3 days, felt it, and stitch it together!  It wasn’t on my goal list because I hadn’t decided to do it until after I wrote that list.  Tiger’s been sleeping on an alpaca blanket my father bought me when he was in Peru and I didn’t want it ruined.  I needed a quick replacement.

image

Goals for July 1 to 5, 2015

  • Knit at least 1/2 of the Sweet Summer Shawl
  • Cast on Miranda Shawl
  • Swatch and Cast on Bubbles Baby Blanket
  • Swatch and Cast on Liquid Silver Shawl
  • Finish spinning and plying the Cormo I’ve been working on since February
  • Start spinning the 3 Feet of Sheep (8 ounces BFL) on July 4 for Tour de Fleece

I’m tempted to write more, but I think this is more than enough.  My husband is off on Friday and Monday for the July 4 holiday.  I will have less crafting time than usual because I’ll be hanging out with him, and we’re going to the beach for at least one day!

Updated List of Goals for 2015

Knitting

  • Knit myself a sweater
  • Improve my finishing techniques
  • Finish MHK Level 1
    • First 3 swatches finished by June 24, 2015
  • Dishcloth Advent Calendar
    • Tribbles, finished January 18, 2015
    • Leaves, finished March 30, 2015 but never blogged
    • Heart Illusion Dishcloths (in progress)
  • Charity Knits
  • Do some test knits
    • Sand Tracks Scarf, finished June 16, 2015
    • Grisou Scarf, finished June 24, 2015
    • Raindrops on Roses Shawlette, finished June 27, 2015
  • Finish or frog all UFOs
    • Traveling Scarf
    • Bigger on the Inside Hat
    • Evenstar
    • Quinn Bag
    • Baby Blue Monster
  • Socks
  • Other Projects
  • Design at least one project from scratch

Crochet

  • Learn to read crochet patterns
  • Learn all the basic crochet stitches.
  • Make at least one non-granny square crochet project
  • Dishcloth Advent Calendar
    • Diagonal Crochet Dishcloths (in progress)

Spinning

  • Breed Specific Spinning
  • Learn to spin on a drop spindle

Weaving

  • Continue playing with color and weave drafts
  • Learn pick up stick drafts
  • Learn Inkle Weaving
  • Learn Kumihimo braiding
  • Explore Twill weaves on the floor loom
  • Make items for the Guild Sale
  • Other

Dyeing

  • Finish dyeing the MAPLE LEAF Shawls
  • pH / water source experiment
  • Return to dye triangles project

WIP Wednesday: June 3, 2015

I’ve gotten a lot of crafting done this week!

Cormo

Last Friday, I spent several hours spinning the Cormo while at a demo.  I started a new bobbin at the beginning of the event.  Here’s how it looked at the end of the event:

image

Heart Illusion Dishcloths

I’ve knit four more dishcloths this week.

image

Raindrops on Roses Shawl

I joined the Testing Pool group on Ravelry and signed up to do two test knits.  This is one of them.  It’s a top down shawl, stockinette with a lace border.  I’ve finished perhaps 1/4 of the stockinette section.

image

Sand Tracks Scarf

This is the second test knit.  It is a cabled scarf on a seed stitch background.  I’ve finished the garter stitch border and the first pattern repeat.  I think I’m really going to love this project.

image

May 2015 in Review

Since I haven’t posted in a couple of weeks, I thought I’d write a quick post re: finished projects and activities.

Finished Projects

Slytherin Houndstooth Scarf

  • Draft: Houndstooth
  • Loom: 15″ Cricket Table Top Loom
  • Reed: 10 dent
  • Warp Stats
    • Yarn: 150 yards (including loom waste) of  Knit Picks Capretta in Platinum and 150 yards (including loom waste) of Cascade Heritage Silk in Pine
    • Loom waste: 31 yards
    • Total Warp Ends: 110
    • Ends Per Inch (EPI): 10
    • Warp Length: 100″
  • Weft Stats
    • Yarn: 153.6 yards Knit Picks Capretta in Platinum and 142.8 yards Cascade Heritage Silk in Pine
    • Picks Per Inch (PPI): 10 – 12
    • Width in the Reed: 11″
  • Ravelry Project Page

I didn’t write a post about finishing this scarf, though it’s appeared in several WIP Wednesday posts (January 22, February 4, March 25).  I had to finish it so that I could weave the Dr. Who scarf on my rigid heddle loom!  Since this is the fourth Houndstooth Scarf I finished (see the posts on Gryffindor, Hufflepuff, and Ravenclaw Houndstooth scarves), I felt like I didn’t necessarily learn anything new on this project.  I did apply the lessons learned on the prior Houndstooth scarves, so the Slytherin is the most consistent of the four.

image
image

Cotton Candy Corriedale

  • Wheel: Kromski Fantasia
  • Spinning Twist: S (clockwise)
  • Plying Twist: Z (counter-clockwise)
  • Ratio: 8:1
  • Singles Yardage: 978 yards
  • Fiber: Sassy Bee Corriedale in Cotton Candy
  • Finished skein:
    • Ply Structure: 420 yards 2-ply; 46 yards n-ply
    • Weight: 4 oz
  • Ravelry Stash page

This is another project that I’ve been working on for a while and which has appeared in a couple of WIP Wednesday posts (February 4, February 18).  As of February 18, I’d finished plying and had wound most of the yarn onto a niddy noddy.  It then sat around, still on the niddy noddy, awaiting washing.

image

Dr. Who Scarf

I did write a blog post about this one!

image

Felted Cat Bed

  • Pattern: garter stitch
  • Yarn: 440 yards Patons SWS in Geranium
  • Needles: US 13 / 9.0 mm
  • Pre-felting dimensions: 23″ wide by 40″ long
  • Post-felting dimensions: 11.5″ wide by 19″ long
  • Made for: Pepper
  • Ravelry Project Page

I whipped out a new cat bed to line the bookshelf where Pepper likes to sleep.  Although she wasn’t very co-operative re: posing for the picture, she loves the bed.  It’s now her favorite sleeping spot.

image
image
image

Semi-finished Projects

These projects are “semi-finished” because I’m making multiple dishcloths from the same patterns, as part of my ongoing Dishcloth Advent Calendar (details in my 2015 Plans post) project.  I’ve finished at least one individual item, but am still working on making more.  I need to make 18 dishcloths in each pattern, and will write blog posts with all the project details when I finish all 18.

Heart Illusion Dishcloths

I finished 9 of these in May.

image
image

Bias Knit, Crochet Cotton Dishcloth

I only finished one of these.  Even with two strands held together, it took about 3 hours to knit one of these, and I didn’t even make it as big as the pattern suggests.  It’ll take me a while to make all 18 of these, but I do like them.

image
image

Activities

I participated in three demos with the Weavers of Orlando.  I’ve written blog posts about two of those: St. Johns River Festival of the Arts and Arts at Audubon Elementary.  The third demo was just this past Friday, and I’m working on writing a post about it!

I also traveled to New England to attend my cousin’s college graduation.  While there, I visited 12 yarn shops, including WEBS!  I bought yarn in all the shops, and will be writing multiple blog posts about the experience.  I needed to take pix of all the new stash for the posts and to update my Rav stash.  I’ve been working on it and I’m just about finished.  I will be posting about these shops throughout the month of June; I plan to get all the posts up no later than June 25 since several of the shops I visited are part of the 2015 I-91 Shop Hop which starts that day.

WIP Wednesday: March 25, 2015

I thought I hadn’t done much crafting in the last week, since I’ve been working with my husband on making tools for weaving.  Then I took the pictures for this post and discovered that I’d done more than I remembered!

Dishcloth Tree

I finished all the leaf-shaped dishcloths.  I thought I had woven in all the ends, but when I was assembling them for this picture, I found one end that I’d missed.  Usually woven in ends = finished for dishcloths.  However, these leaves come out a little bit concave in the center and the designer recommends blocking them.  I’m going to run them through the washer and dryer to see how they come out.  If they don’t flatten out in that process, I’ll block them properly.  Since these are part of a present, I think they are worth the extra attention!

image

Slytherin Houndstooth Scarf

I got quite a bit of weaving done on this scarf.  I’m just about finished with it.

image

It’s so hard to show progress on woven projects because the working surface always looks the same.  I tried taking a picture of the finished cloth wound onto the cloth beam.  I still think it’s hard to see the progress!

image
I didn’t notice until I posted the picture that you can see both my spinning wheel and my floor loom in the background of this picture. Yes, my world is made of fiber!

Liquid Silver

This continues to be the project I work on at Wednesday knit nights.  I only got through 1/2 of a repeat tonight because I was chatting so much.  I discovered that I was doing something wrong on the double yarn overs.  Turns out I’ve been wrapping my yarn overs the wrong direction around the needle.  I did it right before.  I’m not sure when or why I changed my wrapping direction.  You can clearly see the difference in this picture.  I was going to keep on knitting, but looking at this picture, the obvious difference is bothering me.  I do believe I’m going to frog several inches of this project and reknit it correctly.

image

Travel Planning

Last week, we found out that my husband has to go to India in April for work.  And I’m going with him!  In the last week, we’ve renewed his passport, made our plane reservations and hotel reservations.  I’ve filled out paperwork to participate in the TSA Pre-check (I’ve been meaning to do that anyway) and Global Entry (this allows for faster processing when coming through customs upon our return).  Both programs require in-person interviews.  I’ve booked the TSA Pre-check interview and am waiting for preliminary approval on Global Entry before I can book the interview.  I’ve researched visa requirements, done some online research to see what is in the area where we will be visiting, and through Ravelry I’ve made contacts with local knitters.  I seriously love the internet.

We’ll be in India for two weeks, home for one, then in Chicago for a week.  Chris comes home from Chicago, but I’m flying from Chicago to New England to attend my cousin’s college graduation and visit friends and family.  Since I only have a week at home between trips, I’ve got to have everything arranged for those trips also.  I still need to book flights from Chicago to New England and New England back to Orlando.  I’ve got to weave the Dr. Who scarf for my cousin’s graduation gift.  And do taxes.  And get immunized for Hepatitis A  and Dengue Fever.  And so much more.  Most importantly of all, I need to plan my travel knitting!  It’s 25 hours of travel from Orlando to India and 31 hours of travel from India to get back home.  That’s enough time to knit a couple pairs of socks (although I guess I’ll have to sleep some in there).

The trip to India is scheduled at the same time I was planning to be in Indiana for The Fiber Event.  I already had a plane ticket for Indiana, and I’m still planning to go at some point.  I need to change that ticket once we figure out new dates.  Oh, and I registered to attend the TKGA Conference in July.  I haven’t made travel arrangements for that trip yet, and need to do so ASAP.  The first room block already sold out and there’s a limited number of rooms in the second block.  It’s going to be a whirlwind around here for the next few months!

Review Your Cart
0
Add Coupon Code
Subtotal